Skip to content

Construction Quotation Generator

A construction quotation has to describe the scope precisely, split materials from labour, list what is excluded and say how payment is staged. Get any of those wrong and the job ends in a dispute. This construction quotation generator starts with the right structure: a site address, rows for materials, labour and plant hire, a validity date and terms built around stage payments and variations.

FreeNo signupNothing uploaded or storedPrint or save as PDF

Contractor

Upload logo

PNG, JPG or SVG. Stays in your browser.

Client

Document details

Line items

  • 0.00
  • 0.00

e.g. VAT, GST, Sales Tax

You enter the rate that applies to you

Notes, terms and signature

Bank name, account / IBAN, mobile wallet

Signature image (optional)

Drawn or scanned signature. Stays in your browser.

How to use the construction quotation generator

  1. Enter your company details and licence or registration number, then the client's name and the site address where the work will take place.
  2. Write the scope of work in the first row in plain language, then add rows for materials, labour, plant or equipment hire, and subcontracted trades.
  3. List exclusions in the notes: things like permits, removal of hazardous materials, or decoration, so the client knows what is not priced.
  4. Set the stage payments in the terms, for example deposit, mid-point and completion, and state how variations will be priced and approved.
  5. Choose a valid-until date, check the preview, then print or save as PDF for the client to sign and return.

What to include

  • Your company name, contact, licence or registration number and insurance note
  • Client name and the full site address
  • A scope-of-work statement describing what will be built or renovated
  • Materials with quantities and unit prices, grouped by trade if the job is large
  • Labour by days or hours, and plant or equipment hire
  • Exclusions and assumptions, such as access, working hours and permits
  • Stage payment schedule and how variations are handled
  • Validity date and a signature line for client acceptance

Scope, exclusions and variations: the three things a construction quote must say

The scope is what you will do, written clearly enough that both sides can tell when it is finished. The exclusions are what you will not do, which protects you when the client assumes the price included repainting the hallway. Variations are the changes that happen on every job, and the quotation should say how they are priced, for example at the day rate and material cost listed, and that they need written approval before work proceeds. A quote that covers those three things rarely ends in a payment argument, because every surprise has already been described.

Group the rows by trade or by room on larger jobs. A client reading "Kitchen: materials, labour" then "Bathroom: materials, labour" can see where the money goes and can drop a section if the budget is tight.

Stage payments on a construction quotation

Few contractors can fund a whole job up front, and few clients want to pay everything before work starts. The usual compromise is a deposit on acceptance, one or more payments at agreed milestones, and a final balance on completion, sometimes less a small retention until snagging is finished. Put the schedule in the terms of the quotation so it is agreed before the first day on site, and raise an invoice for each stage with our contractor invoice generator, referencing the quotation number each time.

Frequently asked questions

Can I separate materials and labour on the quote?

Yes. Add them as separate rows, or add a materials block and a labour block for each room or trade. The quantity and unit price columns work for both.

How do I handle a provisional sum?

Add a row described as "Provisional sum: kitchen worktop, final cost to be confirmed" with your best estimate. Note in the terms that provisional sums are adjusted to actual cost.

Should the client sign the quotation?

Yes. Turn on the signature line so the client can sign and date their acceptance, which becomes your record that scope, price and terms were agreed.

Can I turn this into a progress invoice?

Use the contractor invoice generator for each stage. Copy the relevant rows from the quotation, reference the quotation number and show the amount paid so far in the notes.

Is this free for a building company to use every day?

Yes. There is no limit, no account and no watermark. The quotation is built in your browser and nothing is uploaded.