How to use the contractor invoice generator for trades and construction
- Enter your trading name, contact details and any licence or registration number your trade requires in the notes.
- Add the client's name and billing address, then use the shipping address block as the site address, which is often different.
- List materials on their own rows with quantity and unit cost, then add labour rows as hours or days multiplied by your rate. Keep them separate so the client can see both.
- Enter the tax percentage that applies, if any, and note any deposit already received and the balance now due in the notes.
- Add payment terms, a retention or snagging note if the contract has one, then print or save as PDF.
What to include
- Your business name, contact details and trade licence or registration number
- Client name plus the site address where the work was carried out
- A job or quotation reference so the invoice matches the original quote
- Materials rows with quantities, unit prices and supplier where helpful
- Labour rows with hours or days and the agreed rate
- Any extras or variations the client approved after the quote
- Deposit already paid and the balance now due
- Payment terms, bank details and a note on retention if it applies
Materials and labour: why separate rows get contractors paid faster
A single line saying "Bathroom refit" invites the client to question the number. Two blocks, one for materials with quantities and one for labour with hours, show where the money went and make it obvious that the total matches the quotation plus any approved extras. It also helps you: if a client disputes a materials cost you can show the receipt, and if they dispute labour you can show the timesheet. This page sets the quantity column to a plain "Qty" so the same table works for 40 metres of cable and 16 hours of labour.
Keep variations visible. If the client added a socket or changed a tile halfway through, give it its own line marked "Variation, approved on site", rather than folding it into the original job. Clients remember agreeing to extras far better when they see them listed.
Progress invoices, deposits and retention
Longer jobs are usually billed in stages: a deposit before work starts, one or more progress invoices, and a final invoice on completion. Number each stage invoice in your normal sequence and state in the notes which stage it covers, what has been paid so far and what remains. If the contract holds back a retention amount until snagging is signed off, show the retention deducted on the final invoice and issue a separate invoice for it later. The tool has no built-in retention percentage; type the figure the contract specifies.
Frequently asked questions
Can I show materials and labour separately?
Yes. Add materials and labour as separate rows, or group them by writing "Materials:" and "Labour:" in the descriptions. Each row has its own quantity and rate, so a materials row can be 40 metres at a unit price and a labour row 16 hours at your rate.
How do I show a deposit the client already paid?
Write the deposit and the balance due in the notes field so both appear under the totals. Give the client a receipt for the deposit with our receipt generator if they did not get one at the time.
Does this handle a subcontractor deduction scheme?
Not automatically. Subcontractors who have amounts withheld by a main contractor usually state the gross, the deduction and the net in the notes. The tool does not apply any deduction itself.
Can I attach photos of the finished work?
Not within the invoice, which is text only. Send photos alongside the PDF in the same email; many clients appreciate it.
Is my client's address stored anywhere?
No. Everything stays in your browser. If you want the page to remember your own details, tick the local draft option; the client details can be cleared each time.